Vantage
Construction Cost Estimator
Checking session…
Projects FREE
Project Configuration
Define your construction project before estimating costs.
Project Profile
Building Characteristics
Parametric Cost Basis
Configure building type and location in the sidebar, then this section will show your $/SF basis and location factors.
CSI MasterFormat — Division Costs
Costs are auto-calculated from your parametric inputs. Edit any division directly — changes are preserved until you reset.
Total Project Cost
Cost per SF
Hard Cost
NPV
Division Cost Breakdown
DivDescriptionCost%
Overhead, Profit & Soft Costs
Configure GC overhead, contingency, and soft costs. These are applied on top of the hard cost from CSI divisions.
General Contractor Costs
5%12.0%25%
0%15%30%
0%5.0%15%
Soft Costs
5%15.0%25%
0%7.0%15%
Industry benchmarks:
GC Overhead & Profit: 8–15% (hard bid), 10–18% (negotiated)
Contingency: 5–10% (CDs), 10–20% (DDs), 15–25% (SD), 20–30% (conceptual)
Soft Costs: 12–20% (typical), 18–25% (complex/government)
Escalation: 4–8%/yr (current market conditions)
Risk & Sensitivity Analysis
Monte Carlo simulation based on your estimate maturity level and construction risk factors.
Point Estimate
P10 — Optimistic
P90 — Pessimistic
P10–P90 Range
Cost Distribution — Monte Carlo (2,000 runs)
Construction Risk Factors
Estimate Maturity
Location Factor
Quality Level
Escalation Factor
Contingency Set
AACE Estimate Classes:
Class 5 (Conceptual): ±30–50% · Class 4 (SD): ±20–30% · Class 3 (DD): ±15–20% · Class 2 (CDs): ±10–15% · Class 1 (Bid): ±5–10%
Cost Estimate Summary
Total project cost across all CSI divisions, overhead, and soft costs.
Total Project Cost
Cost per SF
Hard Cost
NPV (Discounted)
Cost by Phase
Cost Breakdown
Division Cost Chart
Full Cost Summary
Export & Report
Download your estimate in multiple formats.
Export Options
Report Preview
Vantage AI
Construction cost expert